Product Details
Place of Origin: China
Brand Name: Parker
Certification: GS, RoHS, CE, ISO9001
Model Number: PVP
Payment & Shipping Terms
Minimum Order Quantity: 1pc
Price: negotiated
Packaging Details: wooden carton
Delivery Time: 5-8 work days
Payment Terms: D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 50 pcs / month
Series: |
PVM |
Warranty: |
One Year |
Size: |
16 To 140 |
Normal Pressure: |
250 Bar |
Maximum Pressure: |
350 Bar |
Drain Port Pressure: |
0.7 Bar |
Series: |
PVM |
Warranty: |
One Year |
Size: |
16 To 140 |
Normal Pressure: |
250 Bar |
Maximum Pressure: |
350 Bar |
Drain Port Pressure: |
0.7 Bar |
For more Parker products, please consult sales staff
Suction limits for PVP series pumps
The indicated pressures indicate the minimum required pressure at the pump inlet.
Please note that long and narrow suction lines, elbows, type fittings and other accessories
may cause a significant pressure drop.
The suction filter should be carefully dimensioned and maintained regularly.
Low oil temperatures and dynamic processes (rapid regulating movements) also increase the pressure loss.
Leakage oil line
The leakage oil line must be introduced directly and without throttling into the oil tank. It must not be connected to other return oil lines. The end of the leakage oil line must be below the minimum level of the oil tank and as far away from the suction port as possible. This ensures that the oil inside the pump body will not be emptied when the pump is stopped, and the hot oil mixed with air will not be recirculated. For the same reason, when the pump is installed inside the oil tank, the leakage oil line should also be installed to ensure the occurrence of siphoning. This ensures that the pump shell can be filled with oil. The shell % (leakage oil) % pressure must not exceed . The longest line &&& , the minimum diameter should be selected according to the size of the oil pump interface, and the direct-connection low-pressure connector with the largest diameter should be selected.
Transmission
The pump shaft and the motor shaft must be coaxial. A slewing flexible coupling with clearance error compensation and angle error compensation should be used. The installation regulations of the coupling manufacturer must be followed.
Starting
During the first test run and after a longer shutdown, the oil in the pump body may be emptied. This can be dangerous when starting, so the pump must be filled with oil (via the leakage oil line). When starting for the first time, the system is operated without pressure in order to quickly fill the oil and exhaust the pump and the lines. When all the air is exhausted, pressure builds up. Short opening and closing times facilitate exhaustion and enable the pump to be quickly filled with oil.
Sample images